Zum Hauptinhalt springen

Optimal Design of Ski Tracks in Construction Projects: Taking the Warm-Up and Training Ski Track of the South Area in the Yanqing Competition Zone of the Beijing 2022 Winter Olympic Games as an Example

Wu, Yaoyi ; Wu, Xianfeng
In: Buildings, Jg. 13 (2023-03-01), Heft 3, S. 659
Online academicJournal

Titel:
Optimal Design of Ski Tracks in Construction Projects: Taking the Warm-Up and Training Ski Track of the South Area in the Yanqing Competition Zone of the Beijing 2022 Winter Olympic Games as an Example
Autor/in / Beteiligte Person: Wu, Yaoyi ; Wu, Xianfeng
Link:
Zeitschrift: Buildings, Jg. 13 (2023-03-01), Heft 3, S. 659
Veröffentlichung: MDPI AG, 2023
Medientyp: academicJournal
ISSN: 2075-5309 (print)
DOI: 10.3390/buildings13030659
Schlagwort:
  • building information modeling (BIM)
  • Beijing 2022 Winter Olympic Games
  • warm-up and training ski track of the south area in the Yanqing Competition Zone (WTST)
  • digital elevation model (DEM)
  • Building construction
  • TH1-9745
Sonstiges:
  • Nachgewiesen in: Directory of Open Access Journals
  • Sprachen: English
  • Collection: LCC:Building construction
  • Document Type: article
  • File Description: electronic resource
  • Language: English

Klicken Sie ein Format an und speichern Sie dann die Daten oder geben Sie eine Empfänger-Adresse ein und lassen Sie sich per Email zusenden.

oder
oder

Wählen Sie das für Sie passende Zitationsformat und kopieren Sie es dann in die Zwischenablage, lassen es sich per Mail zusenden oder speichern es als PDF-Datei.

oder
oder

Bitte prüfen Sie, ob die Zitation formal korrekt ist, bevor Sie sie in einer Arbeit verwenden. Benutzen Sie gegebenenfalls den "Exportieren"-Dialog, wenn Sie ein Literaturverwaltungsprogramm verwenden und die Zitat-Angaben selbst formatieren wollen.

xs 0 - 576
sm 576 - 768
md 768 - 992
lg 992 - 1200
xl 1200 - 1366
xxl 1366 -